Primary Bed Renovation: ORC, Week 7
We tackled the last major installation for this bedroom renovation this week… the sliding door!
→ Check out the other One Room Challenge guest participant update posts!
→ Watch my process videos on Instagram — saved to the “orc main bed” highlight!
Goals for this week were to:
Finish and hang sliding door — DONE!
Veneer and seal the dresser — not done!
Trim corners and caulk — DONE!
Large format artwork — this will likely have to be finished post-challenge, but I have lots of great inspo and ideas saved!
I ended up getting some smaller, minimal pre-primed pieces of wood trim to finish the corners with. I probably could have saved some money cutting these down myself, but we actually had to finish this room up a week earlier than the normal eight weeks, so I was on a time crunch!
DIY Dad made it into town and we got the door hung! I was nervous about what kind of wall stud situation I was working with — it’s important to get each of the track screws into a stud so that it can reach its max door weight capacity. My rough calculations had my door at about 150 pounds, and the max capacity for the sliding door hardware I got was 220 — so we really wanted to get that right!
We ended up placing a few stud boards above the door opening to hit each of the pre-drilled holes in the sliding door track. We had plenty of studs up there already, but now it’s VERY sturdy lol.
It turned out insane — it’s even better than I imagined! Also, the hardware is a bit of a brighter white than my wall/paint color, that might drive some folks nuts but I LOVE mixing whites — I stick mostly to warmer white tones myself, but I don’t mind when a cooler/brighter tone is mixed in.